Screed types we lay

Each screed type has its own depth, drying time and best use, so choose it by the job and not by habit.

Close-up of a hand-compacted sand and cement screedsand & cement, close-up

Sand and cement screed

The traditional mix, laid by hand and compacted to a firm base. It suits most domestic rooms and extensions.

Close-up of a smooth liquid screed surfaceliquid, close-up

Liquid screed

Pumped into the room and self flowing, so it works well across large areas and over heating pipes.

Close-up of a fast drying screed surfacefast drying, close-up

Fast drying screed

Shortens the wait before tiling or laying flooring, which helps when the programme is tight.

Close-up of a self levelling screed with a straight edgeself levelling, close-up

Self levelling screed

A thin layer that settles flat, used to correct an uneven floor before the final covering goes down.

Close-up of screed covering underfloor heating pipesover UFH pipes, close-up

Underfloor heating screed

Covers the pipes and spreads the heat evenly, and the depth over the pipes affects how quickly the room warms.

Why choose Floor Screeders

Most screeding contractors hide the numbers that homeowners and main contractors need, so we publish them on the page.

Drying timetable

Walk-on and tiling times for each screed type, listed in hours and days.

Type comparison

Sand and cement compared with liquid screed, side by side.

Build-up and depth

How deep the screed should be laid, and the cover required over underfloor heating pipes.

Moisture testing

We test the moisture content before any finish goes down, because a damp screed can ruin a new floor.

Drying timetable

Screed typeWalk onTile or finish
Sand and cement24 to 48 hoursAbout 1 day per mm up to 50 mm, then 2 days per mm
Liquid24 to 48 hoursOften 1 day per mm up to 40 mm, then 2 days per mm
Fast dryingAbout 12 hours1 to 4 days, depending on the finish

How it works

  1. Send your details on the quote form.
  2. We check the floor, the area and the heating requirements.
  3. You receive a quote and a drying timetable for your screed.
  4. We lay the screed and test the moisture before handover.

Common questions

How long does screed take to dry?

Drying depends on the screed type, the depth and the conditions in the building, so see the timetable above. As a rule of thumb, sand and cement needs about a day per mm for the first 50 mm, then two days per mm. Always check the product data sheet.

How deep should screed be over underfloor heating?

The cover over the pipes is set by the screed type and the heating system. As a guide, underfloor heating pipes need at least 25 mm of screed over them. Overall depth is typically 65 mm for sand and cement and 50 mm for liquid.

Can I tile straight onto it?

Only once a moisture test passes, so we run that test before any tiling starts.

Areas we cover

We work across the United Kingdom for residential and commercial construction projects.

Ready to price your floor?

Send your details on the form and we will reply with a written quote and a drying timetable.

Get a quote